No.,Financial and Activity Report (sheet 2 of 2), ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week) 1,CBP:,"CBP: • By the end of December, CBP expects to outlay an additional $9.75 million for Land Ports of Entry, $925,000 for Southwest border technology, $832,000 for Non-Intrusive Inspection equipment. • On December 29th, CBP plans to award a contract for mobile surveillance capability systems. This contract was under protest, which delayed the award. " 2,"TSA:• In December, TSA has deployed Reduced Size Explosive Detection Systems at 4 airports.","TSA: • By the end of December, TSA expects to outlay an additional $20 million for security technologies. • By the end of December, TSA plans to deploy Reduced Size Explosive Detection Systems at 2 additional airports. • By the end of December, TSA plans to close out the closed circuit television (CCTV) contract at one airport. • In January, TSA plans to deploy Reduced Size Explosive Detection Systems at 7 airports. • In January, TSA plans to begin installation of closed circuit television (CCTV) equipment at 2 airports; and finish installation of CCTV equipment at one airport. • In February, TSA plans to deploy Reduced Size Explosive Detection Systems at 7 airports. • In February, TSA plans to finish installation of closed circuit television (CCTV) equipment at one airport. " 3,"USCG:• During the week of December 13th, the Coast Guard outlayed an additional $1 million for cutter and facilities modernization. • During the week of December 13th, the Coast Guard outlayed an additional $1.7 million for the Alteration of Bridges projects that include the Burlington Bridge in Iowa, Galveston Bridge in Texas, and EJ&E Bridge in Illinois. The Coast Guard has already outlayed 100 percent of the $14.6 million for the Mobile Bridge project in Alabama. ",USCG: 4,FEMA:,FEMA: 5,DHS HQ:,"DHS HQ: • By the end of December, DHS Headquarters expects to outlay an additional $540,000 for the St. Elizabeths Headquarters consolidation project. " 6,ICE:,ICE: 7,"• On December 20th, FPS awarded a $4,217 contract for guard services at the O’Neill Federal Building in Boston, MA during ARRA funded construction. FPS received this funding through an interagency agreement with GSA. • On December 20th, FPS awarded a $4,699 contract for guard services at the NARA FRC Building in Waltham, MA during ARRA funded construction. FPS received this funding through an interagency agreement with GSA. ","• On December 23rd, FPS plans to award a modification to an existing contract for guard services at the Lafayette Building in Washington, DC during ARRA funded construction. FPS received this funding through an interagency agreement with GSA. • On December 30th, FPS plans to award a contract for guard services at the GSA Central Building in Washington, DC during ARRA-funded construction. FPS received this funding through an interagency agreement with GSA. " 8,, 9,, 10,,