No.,Financial and Activity Report (sheet 2 of 2), ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week) 1,"CBP:• On December 30th, CBP awarded two contracts totaling approximately $39 million for mobile surveillance capability systems. These contracts were under protest, which delayed the award. ","CBP:• By the end of January, CBP expects to outlay an additional $8.2 million for Land Ports of Entry, $1.8 million for Southwest border technology, $116,000 for Non-Intrusive Inspection equipment, and $37,000 for tactical communications. " 2,TSA:,"TSA: • By the end of January, TSA expects to outlay an additional $30 million for security technologies. • In January, TSA plans to deploy Reduced Size Explosive Detection Systems at 9 airports. • In January, TSA plans to begin installation of closed circuit television (CCTV) equipment at 1 airport and finish installation of CCTV equipment at 1 airport. • In February, TSA plans to deploy Reduced Size Explosive Detection Systems at 9 airports. • In February, TSA plans to finish installation of closed circuit television (CCTV) equipment at 1 airport. " 3,USCG:,"USCG:• By the end of January, the Coast Guard expects to outlay an additional $750,000 for cutter and facilities modernization, and $2.6 million for the Alteration of Bridges projects including the Burlington Bridge in Iowa, Galveston Bridge in Texas, and EJ&E Bridge in Illinois. The Coast Guard has already outlayed 100 percent of the $14.6 million for the Mobile Bridge project in Alabama." 4,FEMA:,FEMA: 5,DHS HQ:,"DHS HQ: • By the end of January, DHS Headquarters expects to outlay an additional $800,000 for the St. Elizabeths Headquarters consolidation project. • In January, DHS plans to begin construction of the Perimeter Security Improvement upgrades at St. Elizabeths West Campus. • In January, DHS plans to begin renovations in 6 historic buildings on St. Elizabeths West Campus. " 6,ICE:,ICE: 7,"• On December 27th, FPS awarded a $33,743 contract for guard services at the Williams Federal Building in Boston, MA during ARRA-funded construction. FPS received this funding through an interagency agreement with GSA. • On January 3rd, FPS awarded a $313,119 modification to an existing contract for guard services at the Lafayette Building in Washington, DC during ARRA funded construction. FPS received this funding through an interagency agreement with GSA. • On January 3rd, FPS awarded a $97,771 modification to an existing contract for guard services at the John W. Peck Federal Building and Kinneary Federal Courthouse in Ohio during ARRA funded construction. FPS received this funding through an interagency agreement with GSA. ","• In January, FPS plans to award a $49,680 contract for guard services at the GSA Central Building in Washington, DC during ARRA-funded construction. FPS received this funding through an interagency agreement with GSA. " 8,, 9,, 10,, 11,, 12,, 13,, 14,, 15,, 16,,