No.,Financial and Activity Report (sheet 2 of 2),,,,, ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week),,,, 1,CBP:,"CBP:• In May, CBP expects to outlay an additional $1.9 million for Land Ports of Entry; $2.7 million for Non-Intrusive Inspection equipment; $12,000 for Tactical Communications; and $2.4 million for Southwest border technology.",,,, 2,TSA:,"TSA: • In May, TSA expects to outlay an additional $20 million for security technologies. • In May, TSA plans to use ARRA funds to deploy Reduced Size Explosive Detection Systems (RSEDS) at 10 airports; and deploy Medium Speed Explosive Detection Systems at 2 airports. • In May, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 2 airports; finish installation of CCTV equipment at 1 airport; and finish installation and close-out the CCTV project at 1 airport. • In June, TSA plans to use ARRA funds to deploy Medium Speed Explosive Detection Systems at 2 airports. • In June, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 1 airport; and finish installation of CCTV equipment at 1 airport. • In July, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 1 airport; and close-out the CCTV project at 1 airport ",,,, 3,USCG:,"USCG: • In May, the Coast Guard expects to outlay an additional $4.6 million for cutter and facilities modernization. To date, 38 of the 40 cutter engineering changes are complete. • In May, the Coast Guard expects to outlay an additional $3.7 million for the Alteration of Bridges projects that include the Galveston Bridge in Texas. The Coast Guard has already outlayed 100 percent of the $14.6 million for the Mobile Bridge project in Alabama and 100 percent of the $36.4 million for the Burlington Bridge project in Iowa. ",,,, 4,FEMA:,FEMA:,,,, 5,DHS HQ:,DHS HQ:,,,, 6,ICE:,ICE:,,,, 7,"FPS:• On April 22nd, FPS awarded a modification to an existing order for armed guard services during ARRA funded construction at the Byrne/Green Complex in Philadelphia, PA. FPS received this funding through an interagency agreement with GSA. • On April 22nd, FPS awarded a modification to an existing order for armed guard services during ARRA funded construction at the U.S. Custom House in Philadelphia, PA. FPS received this funding through an interagency agreement with GSA. • On April 25th, FPS awarded an order for armed guard services during ARRA funded construction at the Thomas S. Foley, U.S. Courthouse in Spokane, WA. FPS received this funding through an interagency agreement with GSA. • On April 27th, FPS awarded an order for armed guard services during ARRA funded construction at the Lafayette Building in Washington, DC. FPS received this funding through an interagency agreement with GSA. • On April 28th, FPS awarded a modification to an existing order for armed guard services during ARRA funded construction at the Birch Bayh, Minton-Capehart, Emmett J. Bean, and Hammond Federal Courthouses in the state of Indiana. FPS received this funding through an interagency agreement with GSA. ",FPS:,,,,