No.,Financial and Activity Report (sheet 2 of 2),,,,, ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week),,,, 1,CBP:,"CBP:• In May, CBP expects to outlay an additional $2.3 million for Land Ports of Entry; $1.1 million for Non-Intrusive Inspection equipment; $12,000 for Tactical Communications; and $2.4 million for Southwest border technology.",,,, 2,TSA:,"TSA: • In May, TSA expects to outlay an additional $20 million for security technologies. • In May, TSA plans to use ARRA funds to deploy Reduced Size Explosive Detection Systems (RSEDS) at 7 airports; deploy Medium Speed Explosive Detection Systems at 2 airports; and deploy Mini In-line Reduced Size Explosive Detectoin Systems at 1 airport • In May, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 2 airports; finish installation of CCTV equipment at 1 airport; and finish installation and close-out the CCTV project at 1 airport • In June, TSA plans to use ARRA funds to deploy Medium Speed Explosive Detection Systems at 2 airports; and deploy Mini In-line Reduced Size Explosive Detection Systems at 1 airport. • In June, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 1 airport ; and finish installation of CCTV equipment at 1 airport. • In July, TSA plans to use ARRA funds to deploy Medium Speed Explosive Detection Systems at 1 airport • In July, TSA plans to use ARRA funds to begin installation of closed circuit television (CCTV) equipment at 1 airport; finish installation of CCTV equipment at 1 airport; and close-out the CCTV project at 1 airport ",,,, 3,USCG:,"USCG: • In May, the Coast Guard expects to outlay an additional $4.1 million for cutter and facilities modernization. To date, 38 of the 40 cutter engineering changes are complete.• In May, the Coast Guard expects to outlay an additional $1.1 million for the Alteration of Bridges projects that include the EJ&E Bridge in Illinois and the Galveston Bridge in Texas. The Coast Guard has already outlayed 100 percent of the $14.6 million for the Mobile Bridge project in Alabama and 100 percent of the $36.4 million for the Burlington Bridge project in Iowa.",,,, 4,FEMA:,FEMA:,,,, 5,DHS HQ:,"DHS HQ:• In May, DHS Headquarters expects to outlay an additional $900,000 for the St. Elizabeths Headquarters consolidation project.",,,, 6,ICE:,ICE:,,,, 7,FPS:,"FPS:In May, FPS plans to award a modification to an existing order for armed guard services during ARRA funded construction at the Wilkie Federal Courthouse in Miami, FL. FPS received this funding through an interagency agreement with GSA. • In May, FPS plans to award an order for armed guard services during ARRA funded construction at the Federal Office Building & Courthouse Federico Degetau and Clemente Ruiz Nazario in Hato Rey, Puerto Rico. FPS received this funding through an interagency agreement with GSA. ",,,,