No.,Financial and Activity Report (sheet 2 of 2), ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week) 1,CBP:,CBP: 2,- No major completed actions to report this week.,- No major planned actions to report this week. 3,"- 1) CBP had outlays of approximately $3.9 million for port modernization activities during the week of 8/1/2011. 2) CBP initiated operations at the newly modernized Carbury, ND LPOE on 7/18/2011. 3) CBP issued a partial notice to proceed for construction for the LPOE modernization project at Los Ebanos, TX on 8/2/2011.","- 1) CBP restored funding modification for signage, K4 bollards, hazmat abatement, and site grading at various CBP-owned LPOE modernization projects is in progress. The modification in the amount of approximately $1.1 million is anticipated to be obligated as early as the week of 8/15/2011. 2) Border Security Deployment Program (BSDP) restored funding modification is in progress. The modification in the amount of approximately $21,000 is anticipated to be obligated as early as the week of 8/15/2011." 4,"- Tactical Communications: - No major completed actions to report this week. Non-Intrusive Inspection (NII): - CBP had outlays of approximately $159,000 for non-intrusive inspection equipment during the week of 8/1/2011.",- Tactical Communications: - No major planned actions to report this week. Non-Intrusive Inspection (NII): - No major planned actions to report this week. 5,"DHS MGMT - No changes in obligations or outlays. ARRA funds retained by DHS for execution have been fully expended. The USCG Headquarters construction operations continue with 4,000 cubic yards (CY) placed for a total of 125,000 CY placed to date. Brick work is proceeding on Building 1 with some areas completed. Roofing installation started for Building 1. Window and curtain wall installation started in Building 2. Vertical construction continues and permanent power/lighting construction started in Garages 1 and 2. Vertical construction for the central utility plant is underway. GSA received DHS Operations Centers (DOC) A Block tenant fit out proposals on August 3 and the Source Selection Evaluation Board convened on August 4. DOC A Block structure is underway. On the Phase 1B Renovation of 6 historic buildings for Adaptive Reuse, on Bldg 31 (Credit union/Coast Guard Historian) the contractor completed replacement of 2nd story, rotted, wood window lintels with steel replacements; demolished 2nd story floor slab; and started/completed capping existing East & West tunnels. Building 33/34 (Dining Hall/Kitchen) - Started excavating, forming/pouring new basement column footings and installing new columns. Building 49 (Fitness Center) - GSA issued Notice to Proceed for the cold dark shell of the existing building.","DHS MGMT - The GSA Federal Acquisition Service (FAS) HQ Consolidation Outfitting Procurement and S1 Efficiency Initiative is on schedule for FY2011 fourth quarter award. On the DHS Operations Centers (DOC) Block A interior fit-out procurement, the Source Selection Evaluation Board should complete their reviews and recommendations to the Contracting Officer by the end of August. The procurement remains on track for fourth quarter award by GSA Public Buildings Service National Capital Region." 6,ICE - Atlas Tactical Communications Project 25 (P25) Region 3 contractor is preparing site surveys in preparation for final site selections for the final design review.,ICE: 7,,"- Atlas Tactical Communications Region 3 P25 Upgrade contractor plans to conduct a Critical Design Review August 10, 2011." 8,,- Atlas Tactical Communications Region 2 P25 upgrade contractor continues to submit leasing packages for proposed tower site locations 9,NPPD:,NPPD - none 10,- GSA has provided funding and properly executed agreements for $21 Million. $1.2 Million of this is currently working through the procurement process., 11,- GSA has provided funding and properly executed agreements for $21.2 Million. $1.1 Million of this is currently working through the procurement process., 12,TSA - TSA’s outlays increased by approximately $2.920M due to the following changes: a checked baggage inspection system OTA with PHX airport ($2.876M); an advanced surveillance OTA with MCI airport ($31.770K); and a technology contract for Advanced Technology X-Ray systems ($12.500K).,TSA - none 13,USCG:,USCG - none 14,"- Modified High Endurance Cutter Automatic Bus Transfer (ABT) Switch Installation contract, adding $36,978 in obligations to replace ABT Breakers due to results of circuit load surveys aboard CGC SHERMAN and CGC BOUTWELL.", 15,"- Modified High Endurance Cutter Refrigeration Upgrade contract, adding $12,630 in obligations to match the composite labor rate values to the contractually agreed labor rate.",